Waste Water Management and Sewage Treatment North Wales
New Yard built for Conwy Golf Club in North Wales and designed to cope with their waste water management through interseptic tanks.
Work consisted of:-
- All site clearence.
- All surveying work to set new levels
- Levelled and compacted stone aggregate base to level
- Carried out all drainage works to work with the new waste water management system installed by Alwyn Jones Ltd
- All timber shuttering works
- All steel fixing
- All concreting works
- Built new wash down area




















